The importance of Pressure Vessel Maintenance: Manufacturers of most pressure vessels will only guarantee the gas charge in a vessel for six months, as a result they recommend it is maintained and recharged to ensure it continues operating correctly on a bi-annual...
Pressure Vessels
3 x Pressurisation Unit Installations
The background: These jobs were carried out at 3 different hotels in Bournemouth. All 3 units were u/s and in need of replacement. As a result, PressBoost installed all 3 units in a 2 day trip, thus, by combining the 3 jobs into such a small time frame we managed to...
Pressurisation Unit and Pressure vessels replacement
This site in Liverpool had multiple problems with their heating system that were causing reliability issues. The control board on the existing LTHW pressure unit was faulty and obsolete while one of the pumps was U/S. Furthermore, both of the 500 litre vessels were...
F&E conversion to pressurised system
This large hotel in Llandudno had an F&E tank in the roof feeding the heating system, however, they were having a number of issues with this method of operation, primarily they were struggling with poor flow which was causing severe disruption to the heating...
Pressurisation Unit Covnersion
This job was carried out at a site in Daresbury, Cheshire. The existing spill and fill pressurisation unit was extremely dilapidated and ageing state. Most controls were u/s, the pipework was consistently blocking and the tank was backed up with sludge. The...
Pressurisation Unit & 750 Litre vessel replacement
This installation was carried out at the RAC building, Birmingham. The existing Armstrong unit was completely u/s. The pumps needed replacing but were obsolete. The pipework within the unit was leaking and steadily corroding the unit. The non return valve and...