by Adam Brown | May 7, 2015 | Latest News
PressBoost were called out to attend a fault on the pressure unit at a site in Tameside which was having problems with their heating. The existing Pressure unit had numerous U/S parts due to age and never having been on a service contract. The 500 Litre expansion...
by Adam Brown | Apr 2, 2015 | Latest News
This job involved PressBoost replacing an existing U/S variable speed control panel on a three pump boosted water unit supplying a hotel, with a new panel fitted with ABB inverters. In conjunction with ABB we have developed a range of variable speed control panels...
by Adam Brown | Apr 2, 2015 | Uncategorized
This job involved PressBoost installing a ball valve housing to an existing tank on a site for Salix Homes in Salford. Salix wanted to implement an air gap to make the tank By-Law 30 compliant in line with the current water regulations. The current tank is a...
by Adam Brown | Jan 20, 2015 | Uncategorized
This install was carried out at a hotel in Bournemouth. This site had a Grundfos pump feeding several areas of the hotel but the actual application of the pump was somewhat of an unknown quantity. However, given the size of the building and the static head of the...
by Adam Brown | Jan 16, 2015 | Uncategorized
This installation was carried out at the RAC building, Birmingham. The existing Armstrong unit was completely u/s. The pumps needed replacing but were obsolete. The pipework within the unit was leaking and steadily corroding the unit. The non return valve and...