Replacement Pressure Unit May 2015

Replacement Pressure Unit May 2015

PressBoost were called out to attend a fault on the pressure unit at a site in Tameside which was having problems with their heating. The existing Pressure unit had numerous U/S parts due to age and never having been on a service contract. The 500 Litre expansion...
Booster Unit panel replacement

Booster Unit panel replacement

This job involved PressBoost replacing an existing U/S variable speed control panel on a three pump boosted water unit supplying a hotel, with a new panel fitted with ABB inverters. In conjunction with ABB we have developed a range of variable speed control panels...
Tank Modifications Salix Homes

Tank Modifications Salix Homes

This job involved PressBoost installing a ball valve housing to an existing tank on a site for Salix Homes in Salford. Salix wanted to implement an air gap to make the tank By-Law 30 compliant in line with the current water regulations. The current tank is a...
Teknospeed Booster Unit Install

Teknospeed Booster Unit Install

This install was carried out at a hotel in Bournemouth. This site had a Grundfos pump feeding several areas of the hotel but the actual application of the pump was somewhat of an unknown quantity. However, given the size of the building and the static head of the...