Pressurisation Unit Install

This installation was carried out for the Cheshire and Wirral Partnership at Macclesfield Hospital. The existing unit was a Baric Filler and was beyond economical repair. The unit had been modified several times over the years and was consequently no longer fit for...

Booster Unit and Tank Install

This job is a complete Booster unit and tank installation for Salix homes in Salford. The building is Fitzwarren Court, a 23 storey tower block from the 1970s. The previous tank was outdated and leaking and the Booster unit was dilapidated. The pump vessel was u/s and...