by Adam Brown | Jul 4, 2016 | Latest News
This job was carried out at a site in Daresbury, Cheshire. The existing spill and fill pressurisation unit was extremely dilapidated and ageing state. Most controls were u/s, the pipework was consistently blocking and the tank was backed up with sludge. The...
by Adam Brown | Jun 20, 2016 | Latest News
PressBoost are proud to announce our affiliation with PumpCare Ltd. PumpCare are an established company with a wealth of experience in pump repair, supply and maintenance. Please visit www.pumpcareuk.co.uk for more information. We are located in Manchester and...
by Adam Brown | Mar 31, 2016 | Latest News
Here at PressBoost we pride ourselves on our ability to offer solutions to the most difficult problems. The images below are of a job at one of our Manchester sites, this site were having a number of issues with a dual LTHW and CHW unit. Effectively, the main issue...
by Adam Brown | Mar 31, 2016 | Xylem / Lowara
This site in Wigan, pictured below, had been having a number of problems with their fixed speed Booster Unit. This Booster feeds a large residential building and as such it is critical that it is kept in optimum condition. The existing unit was ageing and had a...
by Adam Brown | Dec 21, 2015 | Latest News
One of the many services that we offer here at PressBoost is conversion of fixed speed booster units to variable speed. When converting a fixed speed booster to variable speed the energy savings are considerable (approx....