by vardeadmin | Mar 7, 2023 | School, Stuart Turner, Uncategorized
Stuart Turner MAB Booster Set Installation – North West We installed this 3-pump MAB booster set a high school in the North West following the failure of the existing booster set. The existing booster set was Master/Slave and this school lost their master...
by vardeadmin | Feb 27, 2023 | School, Stuart Turner, Uncategorized
Half Term Installation at North West School Here at PressBoost we are often asked to complete works ‘Out of Hours’ or on specified dates. We are always happy to accommodate and work with the client towards a future deadline. A common preference for schools is that...
by vardeadmin | Feb 21, 2023 | HL Hydronics, Uncategorized
H-Line Installation at North West Retailer PressBoost recently supplied and installed this HL Hydronics H-Line Dynamic Pressurisation Unit and O2-X Vacuum Degasser at a leading North West Retailer. This was completed as part of lifecycle upgrade works for the site....
by vardeadmin | Feb 15, 2023 | HL Hydronics, Uncategorized
O2-X Vacuum Degasser Installation We recently installed this O2-X vacuum Degasser and magnetite filter at a site in Central Manchester. The benefits of a vacuum degasser are significant. For example, it removes harmful gases from system content, this makes the system...
by vardeadmin | Feb 8, 2023 | Stuart Turner, Uncategorized
Stuart Turner MAB Booster Set Installation – Salford We completed this twin-pump MAB booster set installation at a residential complex in Salford. The existing set was heavily dilapidated, caused multiple water outages and was overdue replacement. The new MAB...