by vardeadmin | Apr 10, 2023 | Hotel, Uncategorized, Xylem / Lowara
Variable Speed Conversion – Nottingham Hotel This twin-pump Lowara SMB install was carried out at a hotel in Nottingham. The existing set was oversized and fixed speed. Therefore, by resizing it appropriately and converting to variable speed this hotel will...
by vardeadmin | Apr 3, 2023 | Calpeda, Uncategorized
Booster Set Installation – North West Retirement Village We recently installed a new Three Pump Variable Speed Booster Set at a retirement village in the north west of England (carried out for Hydraclean) The old, faulty, obsolete unit was replaced with a new 3...
by vardeadmin | Mar 27, 2023 | Uncategorized, Xylem / Lowara
3-Pump Lowara SMB Variable Speed Booster Set Installation We recently completed this Lowara SMB Booster Set installation for Hydraclean at a site in Central Manchester. Completed by our engineers Carl Rogerson, Antony Chesters and John Murphy, the existing set had...
by vardeadmin | Mar 21, 2023 | Mikrofill, Uncategorized, University
Mikrofill Maxi Pressurisation Unit Installation New Twin Pump Mikrofill Maxi Pressurisation Unit Installation at a University in South Wales. Following our first service visit to this site we found the existing unit had failed completely and been bypassed by a quick...
by vardeadmin | Mar 13, 2023 | HL Hydronics, Uncategorized, University
Twin H-Line and 02-X Vacuum Degasser Installation PressBoost recently completed this installation at a large University. The existing unit had been problematic for a number of years. Site had been through parts for fun. With repair after repair, callout after callout....