Birmingham Hotel – Booster Unit Replacement We recently attended this hotel in Birmingham, where the existing fixed speed Booster Unit had failed and had stopped delivering pressurePressBoost engineer Carl Rogerson installed a new Ebara E-SPD Twin Pump Variable...
Leisure Centre Booster Set Replacement Location: Manchester Property Type: Leisure Centre Installed: Ebara ESPD Twin Pump We recently completed this CWB Set upgrade for a local City Council following the failure of the ageing fixed speed booster set on site. This was...
Ebara Matrix Range – Cold Water Booster Set Installation Recently, whilst working up in Aviemore, we were asked to look at another problematic booster set they had on site. We had been nursing the set along for some time and eventually it had 1no. failed pump,...
Conversion from Atmospheric to Boosted Supply Shortly before Christmas we were called to a large indoor arena in the Northwest to look at poor water pressure in their offices. We found the existing setup was a large storage tank in the roof providing atmospheric...
Ebara Twin-Pump Booster Set Installation – Liverpool We recently completed this installation of an Ebara twin-pump booster set at a domestic property in Liverpool.We were called out to the existing unit OOH as the property had suffered complete water outage....