Booster unit

Variable Speed Panel Installations At Local Police HQ

Variable Speed Panel Installations At Local Police HQ

Why did we replace the existing panels? We have carried out the annual maintenance of all the booster sets on site at a local police headquarters for the last 3 years. As part of this service programme we recommended to our customer retrofitting their fixed speed...

Fixed Speed to Variable Speed Booster Replacement

Fixed Speed to Variable Speed Booster Replacement

The Justification: Here at PressBoost something we take seriously is energy savings, the conversion from fixed speed to variable speed pumps typically results in 30-50% energy savings (one large hotel in Daresbury saw savings of 53%). The larger the motor, typically...

Home Booster Replacement

Home Booster Replacement

The Installation: Here at PressBoost we offer service and maintenance to domestic booster units as well as commercial. Recently we replaced a home booster unit at a school in Liverpool. The existing Grundfos unit had obsolete controls and a failed control board,...

Fixed to Variable Speed Booster Unit Conversion

Fixed to Variable Speed Booster Unit Conversion

This installation was carried out at a site in Manchester City Centre. The existing unit was fixed speed and obsolete, furthermore, one of the two pumps had failed and as such the building was running on only one pump. This building has recently been renovated and is...

Two pump variable speed booster unit replacement

Two pump variable speed booster unit replacement

This site in Wrexham required a replacement variable speed booster unit due to having a number of issues with their existing equipment. The No. 1 pump and inverter were U/S and required replacement, the customer asked PressBoost to quote for a replacement modern...

Three Pump variable speed Booster Unit and Sectional Tank Install

Three Pump variable speed Booster Unit and Sectional Tank Install

This ageing and obsolete transfer set at a site in Salford was in need of updating and the site were keen to change the unit to variable speed,  due to the significant energy savings this option provides. PressBoost cut and capped the pipework feeding the roof tanks...