An existing Boosted Water Unit at a Folkestone hotel was found to have two failed inverters and a faulty pump. We replaced the system with a bespoke Stuart Turner three-pump variable speed unit, complete with high-performance Lowara pumps. Installation carried out by...
Hotel
Stockport Hotel – Ebara E-SPD+ Installation
A hotel in Stockport has recently completed a significant upgrade to its water supply infrastructure by replacing an outdated fixed-speed booster unit with a modern Ebara E-SPD+ three-pump variable speed system. The three-pump design provides enhanced reliability,...
Blackpool Hotel – Bespoke Booster Set Installation
A hotel in Blackpool required a new booster set after the existing system suffered from three failed pumps. The previous setup was oversized for the hotel’s actual water demand, leading to inefficiencies. Our team—Antony Chesters, John Murphy, and Adam Brown—installed...
Pressurisation Unit Replacement – Stratford Hotel
We recently replaced a failed Mikrofill Pressurisation Unit with a new Flamco single-pump system at a hotel in Stratford.The existing unit had suffered failed internals and persistent leaks, affecting the system's efficiency. Engineer Andrew Shelley completed the...
3-pump Stuart Turner MAB Bespoke Booster Set Installation
This is a job we really want to shout about as it represents everything PressBoost is about. We recently got called to this large hotel as the existing 4-pump set had been water damaged in the recent flooding in the North West. When we attended site, we found all 4no....
Oldham Hotel – Booster Set Replacement
We recently visited a hotel / pub from a major chain with a 20+ yr old fixed speed set and vessel which required a written scheme of examination. We replaced this with a new Stuart Turner Aquaboost VARiFLO twin pump variable speed set, and small GWS pump accumulator...
Birmingham Hotel – Booster Unit Replacement
We recently attended this hotel in Birmingham, where the existing fixed speed Booster Unit had failed and had stopped delivering pressurePressBoost engineer Carl Rogerson installed a new Ebara E-SPD Twin Pump Variable Speed Booster and GWS Pressure Vessels.All...
Nottingham Hotel – Xylem SMB Booster Set
Location: NottinghamProperty Type: HotelInstalled: Xylem SMBDuring an emergency callout to this hotel in Nottingham, we found a 3-pump horizontal booster set in a basement plant room with no sumps in the room. Unfortunately this spelt the end for the existing unit and...
Twin-Pump Booster Set Installation – Glasgow
Location: GlasgowProperty Type: HotelInstalled: Hydrovar X We recently completed this smart Xylem Hydrovar X GHV Booster Set installation at a large Hotel in Central Glasgow. The existing pumps were over 30-years old and obsolete. Site were running them until failure...
GUV30/33SV installation – Premium Hotel in Central Manchester
We recently installed this Xylem GUV30/33SV set at a premium hotel in Central Manchester. The existing set was obsolete and down to a single pump, constantly running to maintain water to the hotel. This was a big job for us, both the existing set and the new set had...
Variable Speed Conversion – Nottingham Hotel
This twin-pump Lowara SMB install was carried out at a hotel in Nottingham. The existing set was oversized and fixed speed. Therefore, by resizing it appropriately and converting to variable speed this hotel will recover significant energy savings. A smart...
HL Hydronics Installation – Buxton Hotel
This H-Line and 190 litre spill tank installation was completed at a hotel in Buxton. The site didn’t previously have a pressurisation unit, and reported that they had multiple issues for years with pressure. We attended and found an expansion vessel failed and a...
Liverpool Hotel – Fixed Speed to Variable Speed Conversion
PressBoost were recently contacted by this hotel in Liverpool as they wanted a replacement booster unit as part of their energy saving works across site given the current energy crisis. This week we attended to carry out the replacement installation, working from...
Variable Speed Booster Install – Gatwick Hotel
This Gatwick Hotel had a failing fixed speed booster unit which was losing water. Engineers Carl and Andy replaced the unit in a two day turnaround with a twin pump variable speed unit.[dsm_perspective_image...