0161 798 5872
info@pressboost.co.uk

  • Home
  • About Us
  • The Team
  • Service
  • Facilities
    • Schools/Colleges
    • Universities
    • Hospitals
    • Hotels
  • Rpz Valves
  • Case Studies
  • Energy Saving
  • Network
  • Contact Us
North West Court Building – Booster Replacement

North West Court Building – Booster Replacement

by vardeadmin | May 23, 2025 | Latest News, Uncategorized, Xylem / Lowara

North West Court Building – Booster Replacement PressBoost recently completed a successful booster set replacement at a large court building in the North West. The original system, which featured outdated fixed-speed pumps and a failed pressure vessel, had been...
Booster Set Replacement – Bradford Job Centre

Booster Set Replacement – Bradford Job Centre

by vardeadmin | May 14, 2025 | Latest News, Uncategorized, Xylem / Lowara

Booster Set Replacement – Bradford Job Centre After ongoing reliability issues caused by a failed pump, drive, and problematic panel, this Bradford client needed a dependable solution. PressBoost Engineers Carl Rogerson and Kieran Buckley-Shields installed a new...
Booster Unit Replacement at Research Facility

Booster Unit Replacement at Research Facility

by vardeadmin | May 10, 2025 | Grundfos, Latest News, Uncategorized

Booster Unit Replacement at Research Facility A research and testing facility in York had a fixed-speed Booster Unit in poor condition, which was in need of replacement after a long 25+ years of service.A new Grundfos  2-pump variable speed unit was recommended and...
Folkestone Hotel – Bespoke Unit Install

Folkestone Hotel – Bespoke Unit Install

by vardeadmin | May 1, 2025 | Hotel, Latest News, Stuart Turner, Uncategorized, Xylem / Lowara

Folkestone Hotel – Bespoke Unit Install An existing Boosted Water Unit at a Folkestone hotel was found to have two failed inverters and a faulty pump. We replaced the system with a bespoke Stuart Turner three-pump variable speed unit, complete with...
Twin Pump Stuart Turner VARiFLO Booster Set Installation – Altrincham

Twin Pump Stuart Turner VARiFLO Booster Set Installation – Altrincham

by vardeadmin | Apr 21, 2025 | Latest News, Stuart Turner, Uncategorized

Twin Pump Stuart Turner VARiFLO Booster Set Installation – Altrincham We recently carried out the installation of a Twin Pump Stuart Turner VARiFLO Booster Set at a site in Altrincham, replacing the existing obsolete Wilo system. This upgrade was completed out of...
« Older Entries
Next Entries »

Services

Booster Units
Pump Accumulator Vessels
Pressurisation Units
Written Scheme of Examination
RPZ Valves
Expansion Vessels
Dynamic Pressurisation Units
Vacuum Degassers

More Info

Home
About Us
Suppliers
Case Studies
Privacy Policy
Terms Of Use

Contact Us

PressBoost Limited
Hollins Vale Works
The Hags
BURY
BL9 8GB

info@pressboost.co.uk
0161 7985872

2026 PressBoost Ltd | Website Design Varde Creative Limited

Pressboost Limited | Company Reg Number: 07842756
Registered Office: 32 - 34 Bailey Street, Prestwich, Greater Manchester, England, M25 1HQ