by vardeadmin | Sep 30, 2025 | Ebara, Latest News, Uncategorized
Manchester Apartments – Ebara ESPD Booster Installation At a residential apartment block in Manchester, we recently upgraded an old, obsolete booster set with a new three-pump Ebara ESPD variable speed booster set. As part of the installation, we also modified...
by vardeadmin | Sep 24, 2025 | Latest News, Mikrofill, Uncategorized
Mikrofill Maxi Pressure Unit Upgrade – Manchester We recently completed a project at an airline office building near Manchester Airport, where the existing dual system pressure unit had become problematic and unreliable. To resolve this, our team removed the...
by vardeadmin | Sep 18, 2025 | Grundfos, Latest News, Uncategorized
Harrogate Grundfos Installation At a site in Harrogate, the existing booster set was significantly undersized and unable to meet the building’s water demand – especially during peak usage. This led to poor performance across the system and persistent pressure...
by vardeadmin | Sep 8, 2025 | Hydrovar X, Latest News, Uncategorized
Xylem Hydrovar X 4-Pump Booster Set Installation This was a brilliant project to finally get over the line. This replaced an ageing 5-pump set feeding an apartment block in Salford Quays. The existing set was hanging on by a thread and had caused multiple water...
by vardeadmin | Sep 2, 2025 | HL Hydronics, Hotel, Latest News, Uncategorized
Stockport Hotel – Dynamic H-Line Pressurisation Unit We work closely with a large hotel chain to manage their assets on a lifecycle basis but also remove large expansion vessels where possible to reduce the number of assets they have to have Written Schemes of...