We attended an apartment block in Chester due to a total loss of water at the site. Upon inspection, all three pump drives were found to have failed. To restore water supply temporarily, the pumps were hard-wired. Further investigation revealed that one of the three...
Hydrovar X
Lowara Hydrovar X installation – Student Accommodation Liverpool
We were recently asked to provide a quotation for a replacement booster set at this apartment block in Liverpool following a series of water outages they had experienced, leaving the building teetering on one remaining pump. We quoted for multiple options with the...
Salford Hydrovar X Install
We recently attended a site in Salford where the existing 3-pump booster set was being maintained by another company and had failed completely. Time was of the essence as this meant the building was temporarily fed by another booster set. Fortunately, we were asked to...
Xylem Hydrovar X Installation – Gloucester
Here we have a nice 3-pump Xylem Hydrovar X CWB Set installation in Gloucester.Whilst carrying out a PPM visit at this large site in May we found No.1 pump off and U/S, No.3 pump extremely noisy and not delivering, with only No.2 pump fully operational. This coupled...
Xylem Hydrovar X installations – Site in Bury
Location: BuryProperty Type: Apartment BlockInstalled: Hydrovar X We completed these 2no. XylemUK GHV Hydrovar X installations to an apartment block in Bury late last year. We completed the installation of the 3-pump set first and site were impressed with the...
Mains Water Conversion to Boosted Supply
Location: ManchesterProperty Type: 8 Storey BuildingInstalled: Hydrovar X This 8-storey building in Trafford Park recently ran out of water to the top two floors due to ever decreasing mains pressure. This caused large scale operational issues on site and as such they...
Twin-Pump Booster Set Installation – Glasgow
Location: GlasgowProperty Type: HotelInstalled: Hydrovar X We recently completed this smart Xylem Hydrovar X GHV Booster Set installation at a large Hotel in Central Glasgow. The existing pumps were over 30-years old and obsolete. Site were running them until failure...
Premium Office Building In Central Newcastle
We recently picked up the service of this building and found an ageing and heavily dilapidated set down to a single pump. The pressure vessel had failed as well as a multitude of control issues. We supplied and installed the new Xylem Hydrovar X booster set through...
Emergency Booster Set Replacement – Liverpool
We recently completed this emergency booster set replacement at a site in Central Liverpool. The existing unit had failed completely and caused a water outage in the building. We had been quoting the unit for replacement for some time as 1-pump is already failed, the...