by vardeadmin | Mar 10, 2025 | Hydrovar X, Latest News, Uncategorized, Xylem / Lowara
Lowara Hydrovar X installation – Student Accommodation Liverpool We were recently asked to provide a quotation for a replacement booster set at this apartment block in Liverpool following a series of water outages they had experienced, leaving the building...
by vardeadmin | Mar 4, 2025 | Latest News, Stuart Turner, Uncategorized
Liverpool Office Block – Boosted Water Conversion A large office block in Liverpool was experiencing low mains water pressure, which resulted in no pressure at all on the top floor. Despite the site receiving more than the minimum required by the water board,...
by vardeadmin | Feb 24, 2025 | Latest News, Uncategorized, Xylem / Lowara
Bolton Wanderers Stadium – Cold Water Booster Set Replacement In February 2025 we completed the replacement of a 4-pump fixed speed booster set at BWFC, to convert them to variable speed and provide huge energy savings for the stadium long term. The existing...
by vardeadmin | Feb 14, 2025 | Latest News, Stuart Turner, Uncategorized
Stoke-On-Trent Aquaboost Installation This apartment block in Stoke-on-Trent had an outdated and faulty booster pump set that had completely failed. As a temporary solution, the building was relying on a bypass from another Booster Set, which caused flow issues during...
by vardeadmin | Feb 11, 2025 | Flamco, Hotel, Latest News, Uncategorized
Pressurisation Unit Replacement – Stratford Hotel We recently replaced a failed Mikrofill Pressurisation Unit with a new Flamco single-pump system at a hotel in Stratford.The existing unit had suffered failed internals and persistent leaks, affecting the...