0161 798 5872
info@pressboost.co.uk

  • Home
  • About Us
  • The Team
  • Service
  • Facilities
    • Schools/Colleges
    • Universities
    • Hospitals
    • Hotels
  • Rpz Valves
  • Case Studies
  • Energy Saving
  • Network
  • Contact Us
3-pump Stuart Turner MAB Bespoke Booster Set Installation

3-pump Stuart Turner MAB Bespoke Booster Set Installation

by vardeadmin | Jan 31, 2025 | Hotel, Latest News, Stuart Turner, Uncategorized

3-pump Stuart Turner MAB Bespoke Booster Set Installation This is a job we really want to shout about as it represents everything PressBoost is about. We recently got called to this large hotel as the existing 4-pump set had been water damaged in the recent flooding...
Mikrofill Maxi Installation at Welsh University

Mikrofill Maxi Installation at Welsh University

by vardeadmin | Jan 26, 2025 | Latest News, Mikrofill, Uncategorized, University

Mikrofill Maxi Installation at Welsh University We recently installed this twin pump Mikrofill Maxi Plus Pressurisation Unit at a large University in Wales. The existing unit had a burnt out pump and caused and outage due to single point of failure. Therefore, we...
Flamco 125 Installation at North West Hospital

Flamco 125 Installation at North West Hospital

by vardeadmin | Jan 24, 2025 | Flamco, Latest News, Mikrofill, Uncategorized

Flamco 125 Installation at North West Hospital We recently installed this Flamco 125 unit to replace a failed and obsolete Mikrofill unit at a local hospital.We opted for the Flamco unit to provide a pumped unit, as we highly recommend this against EFD’s. The Flamco...
Oldham Hotel – Booster Set Replacement

Oldham Hotel – Booster Set Replacement

by vardeadmin | Jan 14, 2025 | Global Water Solutions, Hotel, Latest News, Stuart Turner, Uncategorized

Oldham Hotel – Booster Set Replacement We recently visited a hotel / pub from a major chain with a 20+ yr old fixed speed set and vessel which required a written scheme of examination. We replaced this with a new Stuart Turner Aquaboost VARiFLO twin pump...
Sheffield Shopping Centre Booster Set Replacement

Sheffield Shopping Centre Booster Set Replacement

by vardeadmin | Dec 17, 2024 | Latest News, Uncategorized, Xylem / Lowara

Sheffield Shopping Centre Booster Set Replacement We recently attended this shopping centre in Sheffield where the existing Grundfos home Booster Set had failed.PressBoost Senior Engineer Andrew Shelley replaced the unit with an equivalent unit from Lowara, the...
« Older Entries
Next Entries »

Services

Booster Units
Pump Accumulator Vessels
Pressurisation Units
Written Scheme of Examination
RPZ Valves
Expansion Vessels
Dynamic Pressurisation Units
Vacuum Degassers

More Info

Home
About Us
Suppliers
Case Studies
Privacy Policy
Terms Of Use

Contact Us

PressBoost Limited
Hollins Vale Works
The Hags
BURY
BL9 8GB

info@pressboost.co.uk
0161 7985872

2026 PressBoost Ltd | Website Design Varde Creative Limited

Pressboost Limited | Company Reg Number: 07842756
Registered Office: 32 - 34 Bailey Street, Prestwich, Greater Manchester, England, M25 1HQ