by vardeadmin | Jan 31, 2025 | Hotel, Latest News, Stuart Turner, Uncategorized
3-pump Stuart Turner MAB Bespoke Booster Set Installation This is a job we really want to shout about as it represents everything PressBoost is about. We recently got called to this large hotel as the existing 4-pump set had been water damaged in the recent flooding...
by vardeadmin | Jan 26, 2025 | Latest News, Mikrofill, Uncategorized, University
Mikrofill Maxi Installation at Welsh University We recently installed this twin pump Mikrofill Maxi Plus Pressurisation Unit at a large University in Wales. The existing unit had a burnt out pump and caused and outage due to single point of failure. Therefore, we...
by vardeadmin | Jan 24, 2025 | Flamco, Latest News, Mikrofill, Uncategorized
Flamco 125 Installation at North West Hospital We recently installed this Flamco 125 unit to replace a failed and obsolete Mikrofill unit at a local hospital.We opted for the Flamco unit to provide a pumped unit, as we highly recommend this against EFD’s. The Flamco...
by vardeadmin | Jan 14, 2025 | Global Water Solutions, Hotel, Latest News, Stuart Turner, Uncategorized
Oldham Hotel – Booster Set Replacement We recently visited a hotel / pub from a major chain with a 20+ yr old fixed speed set and vessel which required a written scheme of examination. We replaced this with a new Stuart Turner Aquaboost VARiFLO twin pump...
by vardeadmin | Dec 17, 2024 | Latest News, Uncategorized, Xylem / Lowara
Sheffield Shopping Centre Booster Set Replacement We recently attended this shopping centre in Sheffield where the existing Grundfos home Booster Set had failed.PressBoost Senior Engineer Andrew Shelley replaced the unit with an equivalent unit from Lowara, the...