A different install for the PressBoost engineers last week. Installing a Global Water Solutions G500 Reverse Osmosis unit and 2no. 325 litre acccumulator vessels. Thanks to GWS for the referral, we installed this for a Cheshire based Gin Distillery. All equipment...
Uncategorized
Twin Pump Variable Speed Booster Set and GRP Tank Installation
PressBoost have just completed this twin pump variable speed booster set and GRP tank installation for a property in Cheshire.The existing set had obsolete pumps and was down to a single pump; which had recently caused water outages for the property. Therefore, as...
H-Line Replaces Failed Spill and Fill
PressBoost recently installed this H-Line and 3no. 500 litre Polyethylene expansion tanks to a hotel in Blackpool. The existing unit had failed completely some time ago and had been bypassed by others as an emergency measure. The steel spill tank had corroded in...
High Rise Booster Unit Install
This 9 floor high rise had never been able to have its windows cleaned before due to lack of water supply.PressBoost installed a Cat 5 Booster Set off the boosted mains to enable the cleaners to tap into the supply on the roof. Talk to us about supplying and...
Lowara Mini Presfix and Expansion Vessel Installation
PressBoost recently installed this Lowara Mini Presfix and 60 litre Expansion Vessel on a CHW system in Hull. The existing analogue unit had failed completely and had not been maintained for many years. We completed the installation at this time of year as the chiller...
Leisure Centre Dynamic Spill Installation
Last week PressBoost installed a new Dynamic spill setup for a leisure centre in Knowsley. The existing analogue set had stood the test of time but over recent years had become problematic for site. As such they wanted an upgrade, and what an upgrade our lads provided...
University Tank and Booster Installation
This local university building was struggling on mains pressure to its roof tanks and then atmospheric fed down the building. PressBoost engineers installed two 1250 litre tanks and a twin pump Variable Speed Booster Set. We also converted/linked out the pipework in...
Variable Speed Booster Set Install – Knowsley School
Over the weekend PressBoost installed this 3-pump variable speed Stuart Turner Booster Set at a school in Knowsley. The existing set had a master inverter which had failed leaving the school with no water. The set was obsolete so as such the most suitable option was...
North West University Cat 5 Booster Set Installation
We recently completed this installation of a CAT 5 Booster Set and bib tap for a North West University. The only suitable installation location was in a bike store, so we fitted galvanised cage to protect the unit and prevent tampering. A great install from our lads...
Variable Speed Booster Install – Gatwick Hotel
This Gatwick Hotel had a failing fixed speed booster unit which was losing water. Engineers Carl and Andy replaced the unit in a two day turnaround with a twin pump variable speed unit.[dsm_perspective_image...
West Yorkshire Hospital – Booster Set Installation
PressBoost engineers Anthony, Ben and Adam recently installed this Booster Set in a West Yorkshire Hospital. The new set sized Duty Assist / Standby to suit the demands of the site, the installation took place over night on a Friday / Saturday morning as required by...
Two Lowara Presfix Beta Installations at Local Hospital
These two Lowara Presfix Beta installations at a local hospital were recently completed in one day by PressBoost engineer Andy Shelley. [dsm_perspective_image src="https://www.pressboost.co.uk/pbWP/wp-content/uploads/2022/05/lowara-presfix-install-1.webp"...
Twin Pump Booster set and Tank Installation – Hospital
We recently installed a Twin-Pump Variable Speed Booster Set and a two-piece tank from Fluid Water Solutions at this North West hospital. Working for Pumpcare, we completed this installation through the night to minimise disruption to the hospital. A very well planned...
Variable Speed Unit Installation – Liverpool Apartment Block
This apartment block in Liverpool required a replacement to its fixed speed unit for a new variable speed one. The work required a wall to be removed due to the size of the motors, and the site now enjoy significant energy savings. Expertly installed by PressBoost...
Booster Set Installation – Manchester Bar
This Manchester bar had poor mains pressure and on a busy night ran out of flow to the toilets and kitchen.PressBoost engineers Antony and Andy had to come up with a solution which could fit into this tight area and keep up with replenishment to the tank and for the...
Fluid Water MAB Booster Set Installations – Southampton
We recently completed these two MAB booster set installations at a hotel in Southampton. The existing units had reached end of life. Both units were dilapidated and obsolete, plus one of the systems was fixed speed. As a result, the site will also receive energy...
Reflex Variomat Installation – Central Liverpool
We recently completed this dynamic pressurisation unit installation at a building in Central Liverpool. They have been having problems with the existing unit for some time and wanted to upgrade. The unit of choice in this instance is the excellent Reflex Variomat with...
Booster Set Replacement – Birmingham City Centre
Complete Failure of 4-Pump Booster Set We were recently contacted by a new customer in Birmingham, as they had no water as their booster set had failed . This is a prestige 39-storey building spanning over 7,000 square feet, interruption to water at a building of this...
PressBoost Ltd Site Unify Platform
Recently, we began the process of moving our engineer reporting system over to a Site Unify Platform. Having seen the success of Double Zero Solutions work with Hydraclean Limited, who we work closely with, we decided to meet with Dave Broomhead of Double Zero to...
Variable Speed Panel Installations At Local Police HQ
Why did we replace the existing panels? We have carried out the annual maintenance of all the booster sets on site at a local police headquarters for the last 3 years. As part of this service programme we recommended to our customer retrofitting their fixed speed...
Fixed Speed – Variable Speed Water Booster Set Conversion
The Project: We recently carried out a variable speed conversion of a cold water booster for a University in North West England. We were called in by the University to upgrade their archaic pump set and remove 2 steel cold water storage tanks. Replacing them with a...
Cold Water Booster Set Replacement
Booster Set Upgrade: Overnight, we carried out a booster set replacement for a multi-purpose building in a prime location in Manchester. The building operates as offices and a gym, as a result, they required minimal downtime. The existing set was fixed speed but also...
Pressure Vessel Maintenance
The importance of Pressure Vessel Maintenance: Manufacturers of most pressure vessels will only guarantee the gas charge in a vessel for six months, as a result they recommend it is maintained and recharged to ensure it continues operating correctly on a bi-annual...
RPZ Valve Servicing
The Legal Requirement: One of the most important services we offer at PressBoost is servicing of RPZ (backflow prevention) devices. Quick filling loops which used to be installed to most pressurised heating systems are no longer satisfactory, as LTHW & CHW...
3 x Pressurisation Unit Installations
The background: These jobs were carried out at 3 different hotels in Bournemouth. All 3 units were u/s and in need of replacement. As a result, PressBoost installed all 3 units in a 2 day trip, thus, by combining the 3 jobs into such a small time frame we managed to...
PressBoost New Headquarters Renovation
Background: In August 2016 we managed to secure our new, larger premises that will be our home for the foreseeable future. We are still conveniently located in Prestwich, just off the M60 motorway. The building dates back to 1892, over the years it has been a Co-op...
Three Pump variable speed Booster Unit and Sectional Tank Install
This ageing and obsolete transfer set at a site in Salford was in need of updating and the site were keen to change the unit to variable speed, due to the significant energy savings this option provides. PressBoost cut and capped the pipework feeding the roof tanks...
Tank Modifications Salix Homes
This job involved PressBoost installing a ball valve housing to an existing tank on a site for Salix Homes in Salford. Salix wanted to implement an air gap to make the tank By-Law 30 compliant in line with the current water regulations. The current tank is a...
Teknospeed Booster Unit Install
This install was carried out at a hotel in Bournemouth. This site had a Grundfos pump feeding several areas of the hotel but the actual application of the pump was somewhat of an unknown quantity. However, given the size of the building and the static head of the...
Pressurisation Unit & 750 Litre vessel replacement
This installation was carried out at the RAC building, Birmingham. The existing Armstrong unit was completely u/s. The pumps needed replacing but were obsolete. The pipework within the unit was leaking and steadily corroding the unit. The non return valve and...